Supply - Sequence of Play
Sept 29, 2014 5:46:21 GMT
Post by tim on Sept 29, 2014 5:46:21 GMT
CNA Supply Process flow
Game Turn
III. Naval Convoy Stage
A) Naval Convoy Schedule Phase
• Consult Convoy Level Chart (Axis 56.4-5) and the Axis Naval Convoy Level
• Roll a die to determine the tonnage available for the next Game Turn
• Enter the result on the Axis Supply and Admin.xls, Convoy tab in Column G (GT Capacity)
• Plan for the following Game Turn “what specific cargoes the convoys will carry and their routes.”
• Plan for replacements Two Game Turns in advance
B) Convoy Resolution Phase
1) Naval Convoy Recon Segment
• Allied Air Player flies Naval Recon missions (42.5)
o Reports missions flown and success or failure
• Successful recon flights report results based on tonnage (CW 42.53)
o None (no tonnage)
o Small (< 5000 tons)
o Medium (3000-10,000)
o Large (7,000+)
2+3) Convoy Lane Assignments and Bombing Segments
• Shipping Convoy AA is 1 Flak/AA Pt per 1000 tons [56.16] – rounded?
• Results come from the [41.45] Bomb Barrage chart using the Bomb Pts row
• Results for each convoy lane are reported as a % loss
• Adjust this turn’s Convoy Shipping and save the spreadsheet
IV. Store Expenditure Phase
• Expend Stores for all TOEs except POWs [51.1]
o Every TOE Strength Point in play requires four Stores Points[51.11], except:
- HQ and engineer units require only one Stores Point per (regardless of assigned TOE equipment) [51.12 was 51.13]
- Units sitting in Oases do not require Stores Points [52.3].
- Guard points require two Stores points per Game-Turn [51.17 was 51.14].
o Note units on half rations [51.23]
o Note units that didn’t receive stores, add a disorg pt [51.21]
o Units without stores for two turns suffer attrition [51.22]
• Italian Pasta rule – expend 1 Water point for every Italian Battalion [52.6]
• Evaporation and Spillage [49.3]
o Deduct 6% (or 9% for CW) of Fuel and Water
- In Supply Dumps or at Airfields
- Cargo in Trucks or Coastal Shipping
- Fuel and Water in gas tanks and radiators are not subject to this rule [29.34]
• Record changes in Land Force sheet, and on Supply Dump sheet and save
Operations Stages
B. Weather Determination
• If Hot, apply additional 5% Evaporation and Spillage for Fuel and Water [29.34]
• Construction halted on maps with Rainstorms or Sandstorms [24.22]
C. Organization Phase
1. Water Distribution Segment
• Each infantry Battalion or Company requires 1 Water point [52.41]
• Vehicle TOE (Tank, Recce, Artillery, HQ, etc) or Truck Point [52.42]
o requires 1 Water point each Ops stage it uses any of its CPA
• Hot weather doubles all water expenditures for units[29.35]
o Construction sites require 10 extra Water pts in Hot Weather [24.21]
• Prisoners use stores, at a rate of one Stores Point per five Prisoner Points.[51.14][28.15]
• Record changes on Land Forces and Admin and/or Supply sheets and save
2. Reorganization Segment
• Trucks, Reinforcement and Replacements are attached or detached
4. Construction Segment
• a. Construction Completion step
• b. Construction Initiation/Continuation
o Supplies are expended see [24.17] for amounts and length of time
6. Supply Distribution Segment
• Supplies in a hex may redistributed into units, trucks loaded and unloaded
• Update the Forces and Admin and/or Supply sheets and save
7. Tactical Shipping Segment
• Update the Admin and Supply sheets and save
D. Naval Convoy Arrival Phase
• Supplies appear in Port of arrival or Entry hex
• Axis plans for arrival of replacements from the Axis replacement schedules
• In the first arrival phase of the month, CW uses their Production System to plan for replacements one month in advance [20.72]
• Update Admin and Supply Sheet and save
E. Commonwealth Fleet Phase
• Undertake repair work on ships
F. Land Support Air Phase
• 7. Tactical Maintenance – refit, ready, repair and rearm aircraft
I. Movement Segment
• First Line Trucks pick up and deposit supplies, using CPA points
J. Truck Convoy Movement Segment
• 2nd/3rd Line trucks are moved, supplies dropped off and picked up
L. Repair Phase
• 1. Towing Segment – may tow broken down and recovered vehicles
• 2. Maintenance Segment – may attempt to repaid vehicles that weren’t towed
o See 22.15 for repair costs
VIII. Strategic Air Recovery Stage
• B. Aircraft Maintenance Phase
Game Turn
III. Naval Convoy Stage
A) Naval Convoy Schedule Phase
• Consult Convoy Level Chart (Axis 56.4-5) and the Axis Naval Convoy Level
• Roll a die to determine the tonnage available for the next Game Turn
• Enter the result on the Axis Supply and Admin.xls, Convoy tab in Column G (GT Capacity)
• Plan for the following Game Turn “what specific cargoes the convoys will carry and their routes.”
• Plan for replacements Two Game Turns in advance
B) Convoy Resolution Phase
1) Naval Convoy Recon Segment
• Allied Air Player flies Naval Recon missions (42.5)
o Reports missions flown and success or failure
• Successful recon flights report results based on tonnage (CW 42.53)
o None (no tonnage)
o Small (< 5000 tons)
o Medium (3000-10,000)
o Large (7,000+)
2+3) Convoy Lane Assignments and Bombing Segments
• Shipping Convoy AA is 1 Flak/AA Pt per 1000 tons [56.16] – rounded?
• Results come from the [41.45] Bomb Barrage chart using the Bomb Pts row
• Results for each convoy lane are reported as a % loss
• Adjust this turn’s Convoy Shipping and save the spreadsheet
IV. Store Expenditure Phase
• Expend Stores for all TOEs except POWs [51.1]
o Every TOE Strength Point in play requires four Stores Points[51.11], except:
- HQ and engineer units require only one Stores Point per (regardless of assigned TOE equipment) [51.12 was 51.13]
- Units sitting in Oases do not require Stores Points [52.3].
- Guard points require two Stores points per Game-Turn [51.17 was 51.14].
o Note units on half rations [51.23]
o Note units that didn’t receive stores, add a disorg pt [51.21]
o Units without stores for two turns suffer attrition [51.22]
• Italian Pasta rule – expend 1 Water point for every Italian Battalion [52.6]
• Evaporation and Spillage [49.3]
o Deduct 6% (or 9% for CW) of Fuel and Water
- In Supply Dumps or at Airfields
- Cargo in Trucks or Coastal Shipping
- Fuel and Water in gas tanks and radiators are not subject to this rule [29.34]
• Record changes in Land Force sheet, and on Supply Dump sheet and save
Operations Stages
B. Weather Determination
• If Hot, apply additional 5% Evaporation and Spillage for Fuel and Water [29.34]
• Construction halted on maps with Rainstorms or Sandstorms [24.22]
C. Organization Phase
1. Water Distribution Segment
• Each infantry Battalion or Company requires 1 Water point [52.41]
• Vehicle TOE (Tank, Recce, Artillery, HQ, etc) or Truck Point [52.42]
o requires 1 Water point each Ops stage it uses any of its CPA
• Hot weather doubles all water expenditures for units[29.35]
o Construction sites require 10 extra Water pts in Hot Weather [24.21]
• Prisoners use stores, at a rate of one Stores Point per five Prisoner Points.[51.14][28.15]
• Record changes on Land Forces and Admin and/or Supply sheets and save
2. Reorganization Segment
• Trucks, Reinforcement and Replacements are attached or detached
4. Construction Segment
• a. Construction Completion step
• b. Construction Initiation/Continuation
o Supplies are expended see [24.17] for amounts and length of time
6. Supply Distribution Segment
• Supplies in a hex may redistributed into units, trucks loaded and unloaded
• Update the Forces and Admin and/or Supply sheets and save
7. Tactical Shipping Segment
• Update the Admin and Supply sheets and save
D. Naval Convoy Arrival Phase
• Supplies appear in Port of arrival or Entry hex
• Axis plans for arrival of replacements from the Axis replacement schedules
• In the first arrival phase of the month, CW uses their Production System to plan for replacements one month in advance [20.72]
• Update Admin and Supply Sheet and save
E. Commonwealth Fleet Phase
• Undertake repair work on ships
F. Land Support Air Phase
• 7. Tactical Maintenance – refit, ready, repair and rearm aircraft
I. Movement Segment
• First Line Trucks pick up and deposit supplies, using CPA points
J. Truck Convoy Movement Segment
• 2nd/3rd Line trucks are moved, supplies dropped off and picked up
L. Repair Phase
• 1. Towing Segment – may tow broken down and recovered vehicles
• 2. Maintenance Segment – may attempt to repaid vehicles that weren’t towed
o See 22.15 for repair costs
VIII. Strategic Air Recovery Stage
• B. Aircraft Maintenance Phase